Mining Proposal application for the Wonmunna Iron Ore Project M47/1423, M47/1424, M47/1425 L47/727 Revised – March 2015 Project Name: Wonmunna Iron Ore Project Tenements: M47/1423, M47/1424, M47/1425 L47/727 Site contact: Andrew Caruso, Managing Director : andrewcaruso@ascotresources Phone: 08 Mobile: Roy Hill Iron Ore Pty Ltd (RHIO) proposes to amend the existing Roy Hill Iron Ore Mine Proposal to increase the ground disturbance footprint by 5,995 hectares, incorporate a life of mine water management strategy (including water abstraction, dewatering and Managed Aquifer Recharge), revise the waste material management strategy including Revised Proposal for the Roy Hill Iron Ore Mine The price difference between highgrade 65% iron ore and 58% ore surged to a record $905 per tonne, while between benchmark 62% ore and lowgrade the spread stood at $575China exchange considers accepting lowergrade iron
PROPOSAL FOR PRELIMINARY EXPLORATION OF MALANGTOLI IRON ORE DEPOSIT IN ESUB BLOCK OF BONAIKENDUJHARIRON ORE BELT IN THE DISTRICTSUNDARGARH KENDUJHAR, ODISHA SYNOPSIS 1 Mineral Iron 2 Location The area of investigation falls in parts of Survey of India Toposheet Nos 73 G/5, being one Roy Hill Iron Ore Pty Ltd Proposal description: The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of Revised Proposal for the Roy Hill Iron Ore Mine EPA 1 PROPOSAL FOR PRELIMINARY EXPLORATION OF MALANGTOLI IRON ORE DEPOSIT IN GSUB BLOCK OF BONAIKENDUJHAR BELT, DISTRICT–SUNDARGARH KENDUJHAR, ODISHA 100 Introduction 111 The Banded Iron formation (BIF) and associated VolcanoSedimentary sequence ofPROPOSAL FOR PRELIMINARY EXPLORATION (G3) OF
Request PDF A proposal of an alternative route for the reduction of iron ore in the eastern Amazonia Brazil has decreased the utilization of wood under the form of either charcoal or fuel wood BHP Billiton Iron Ore Pty Ltd (BHP Billiton Iron Ore) currently operates five iron ore mines in the Pilbara region of Western Australia: Yandi, Mining Area C, Mount Whaleback, Eastern Ridge and Jimblebar To meet future iron ore demand, BHP Billiton Iron Ore is proposing new developments to their operations, known as the Strategic ProposalB HP Billiton Iro n Ore P trategic Proposal iron ore production and about 30% of the total chrome ore production of the state Daitari iron ore lease is spread over Talpada village, Rebana Reserve Forest and Daitari Protected Forest between latitudes 21005’331”N 21007’088’’N and longitudes 85 046’019”E 85 49’170’'E The area is covered under Survey of India DAITARI IRON ORE MINING PROJECT
This morning, Luo Tiejun, vice president of China Iron and Steel Industry Association, held a video conference with Fang Ruisi, vice president of Rio Tinto iron ore marketing With regard to the news that the Australian parliamentary committee has proposed to strengthen the management of iron ore mining in Western Australia in order to protect the heritage sites of indigenous people, Rio Tinto